ONSHORE PLANT TRANSPORTATION

STABILITY CHECK FOR STRUCTURE IN THE MOVEMENT

BLOCK HANDLING ANALYSIS

STEEL STRUCTURE ENGINEERING

ONSHORE PLANT TRANSPORTATION

POSCO 1CAL Rationalization Project, POSCO 1CGL
Rationalization Project

It is the Furnace Shifting Project that solve the using a time-tested method of construction including problems for removal of furnace and then reinstallation. The new method of construction is the furnace shifting method as new furnace fabricate in advance and then new furnace is transported, installed at final position.
It is a epoch-making method for construction period shortening, manpower and amount of money reduction comparision with the using a time-tested method of construction.