DATE | CLIENT'S NAME | SERVICES
PERFORMED |
|
2016. 02.~ | KR | BWMS LAND TEST FACILITY FABRICATION & INSTALLATION |
|
2016. 01.~ 2016. 02. | KR | BWMS LAND TEST FACILITY DESIGN |
|
2015. 12.~ 2016. 04. | BOSUNG | HEBRON TEMP. SEAWATER SYSTEM FABRICATION & INSTALLATION |
|
2015. 10.~ 2015. 12. | JUWON | MOTOR CASING FABRICATION |
|
2015. 09.~ 2015. 10. | BOSUNG | HEBRON TEMP. SEAWATER SYSTEM DESIGN |
|
2015. 07.~ 2015. 08. | KYOUNGCHEON DEVELOPMENT | DRIVING PILE MACHINE FRAME DESIGN |
|
2015. 07. | ALPEC | BARONIA TOPSIDE PACKAGE LIFTING & MOTION ANALYSIS |
|
2015. 06.~ 2015. 07. | BNSKOREA | MANUFACTURE OF PORTABLE OFFENSIVE ODER TREATMENT SYSTEM |
|
2015. 02.~ 2015. 03. | SK E&C | LIFT FRAME (30TON) DESIGN & FABRICATION |
|
2015. 01.~ 2015. 02. | POSCO PLANTEC | REMOVING MANUAL & SEQUENCE FOR KWANGYANG GTSU NO. 3, 5 |
|
2014. 12.~ 2015. 05. | LINE | MOONSANHO TRANSPORTATION, INSTALLATION DESIGN & SUPERVISOR |
|
2014. 12. | SEBANG | KRAMO GUYING SYSTEM CONSULTING |
|
2014. 12. | SEBANG | SPREADER (50TON) DESIGN & FABRICATION |
|
2014. 11. | DONGBANG | SPREADER BEAM(175TON) DESIGN & FABRICATION |
|
2014. 10.~ 2014. 11. | AMES | Osan MAIN EQUIPMENT INSTALLATION ENGINEERING |
|
2014. 10.~ 2014. 11. | AMES | FABRICATION OF OFFENSIVE ODER TREATMENT SYSTEM |
|
2014. 10. | ULSAN METROPOLITAN OFFICE OF EDUCATION | IMPROVING WORK OF THE DISASTER WEAKNESS FACILITIES FOR BANGEOJIN, NAMMOK ELEMENTARY SCHOOL |
|
2014. 09. | SEBANG | WASTE HEAT BOILER TRANSPORTATION DESIGN |
|
2014. 06.~ 2014. 07. | KOROAD(ULSAN) | ACADE FABRICATION & INSTALLATION |
|
2014. 04.~ | BACK'S MARINE | DECOMPRESSOR 2SETS DESIGN & FABRICATION |
|
2014. 04.~ 2014. 05. | DONGBU | CYCLONE INSTALLATION & REMOVING ENGINEERING |
|
2013. 12.~ 2014. 02. | POSCO PLANTEC | GUMI DAM FLOODGATE SUPPLEMENT INSTALLATION |
|
2013. 12. | PANALPINA KOREA | SPREADER BEAM(230TON) FABRICATION & LOADTEST |
|
2013. 10. | DONGBANG | TAILING DEVICE(100 TON) DESIGN |
|
2013. 10. | PANALPINA KOREA | SPREADER BEAM(2SETS) & LIFTING YOKE(4SETS) FABRICATION & LOADTEST |
|
2013. 9.~ 2013. 10. | HWASUNG R&A | CONTAINER TEST PROVISION FABRICATION & INSTALLATION |
|
2013. 07. | PANALPINA KOREA | COMPLETE CRANE SUPPORT FABRICATION |
|
2013. 05. | PANALPINA KOREA | SPREADER BEAM(130TON) FABRICATION & LOADTEST |
|
2013. 04.~ 2013. 09. | POSCO PLANTEC | GUMI DAM FLOODGATE COMPPLEMENT FABRICATION |
|
2013. 04. | PANALPINA KOREA | 3RD SHIPMENT G/T STORAGE KEEPING PACKAGE FABRICATION |
|
2013. 03. | PANALPINA KOREA | 2ND SHIPMENT G/T STORAGE KEEPING PACKAGE FABRICATION |
|
2013. 01. | PANALPINA KOREA | 1ST SHIPMENT G/T STORAGE KEEPING PACKAGE FABRICATION |
|
2012. 12.~ 2013. 01. | DONGBANG | MILL HOUSING INSTALLATION ENGINEERING & SUPERVISOR |
|
2012. 7.~ 2012. 11. | HWASUNG R&A | BWTS GRE SPOOL FABRICATION & INSTALLATION |
|
2012. 6. | POSCO E&C | GUMI DAM OBSERVATORY REINFORCEMENT PROJECT |
|
2012. 2.~ 2012. 5. | HANSOLCSN | KWANGYANG GTSU#9 TRANSPORTATION ANALYSIS |
|
2012. 1.~ 2012. 5. | HWASUNG R&A | BWTS BALLAST TANK FABRICATION & INSTALLATION |
|
2011. 9.~ 2011. 12. | POSCO PLANTEC | GUMI DAM FLOODGATE REINFORCEMENT & INSTALLATION |
|
2011. 9. | KHNP | Wool JIN STATOR ¼³Ä¡ ENGINEERING & SUPERVISOR |
|
2011. 7.~ 2011. 8. | KHNP | KoRi 3, 4 TURBINE BUILDING GALLERY FRAME FABRICATION & INSTALLATION |
|
2011. 7.~ 2011. 8. | DONGBANG | KAOHSUING RMQC 3UNITS SEATRANSPORTATION DESIGN |
|
2011. 5. | HHI | VESSEL(1700TON) WEIGHING PROJECT |
|
2011. 3.~ 2011. 6. | POSCO PLANTEC | GUMI DAM BOTTOM SUPPORT FABRICATION & HOIST WINCH INSTALLATION |
|
2011. 3.~ 2011. 8. | POSCO PLANTEC | GUMI DAM SAND-FLASH GATE FABRICATION & INSTALLATION |
|
2011. 2. | SGT | RUWAIS EVA INTERMEDIATE SUPPORT DESIGN |
|
2011. 1. | KUMSUNG E&C | CONCRETE FORM DESIGN & FABRICATION |
|
2011. 1. | SLK KUKBO | FSU TOWING & HOOK UP PRE. DESIGN |
|
2010. 10. | KHNP | New-WolSong ¥± STATOR INSTALLATION ENGINEERING & SUPERVISOR |
|
2010. 9. | HYUPJIN | QURAYYAH STACKING FRAME DESIGN |
|
2010. 9. | HHI | LIFTING BEAM 7.8M ANALYSIS & DESIGN |
|
2010. 8.~ 2010. 12. | HHI | HABSHAN 5 TEMP. FURNACE DESIGN & FABRICATION |
|
2010. 6.~ 2010. 7. | POSCO E&C | WATER GATE OF GU-MI DAM ERECTION |
|
2010. 2. | SLK KUKBO | FLOAT ON DESIGN |
|
2009. 11. | DONGBANG | VESSEL WEIGHING |
|
2009. 11. | KHNP | New-WolSong STATOR INSTALLATION ENGINEERING & SUPERVISOR |
|
2009. 10. | COENS | BURNER BOOM SHIPPING SADDLE DESIGN & FABRICATION |
|
2009. 9. | SEBANG | OUTER COOLER SHIPPING FRAME DESIGN |
|
2009. 9. | SPACO | THRUSTER LIFTING DESIGN |
|
2008. 12.~ 2009. 7. | DONGBANG | VALIDATION MODULE TRANSPORTATION (ULSAN-VANCOUVER,WA) DESIGN |
|
2009. 7. | COENS | SKARV FPSO EQUIPMENTS 2ND PACKAGE LOCAL TRANSPORTATION DESIGN |
|
2009. 5. | COENS | SKARV FPSO EQUIPMENTS 1ST PACKAGE LOCAL TRANSPORTATION DESIGN |
|
2009. 4. | WOOJIN | RAS LAFFAN C IWPP HRSG TRANSPORTATION DESIGN |
|
2009. 3. | KHNP | New-KoRi ¥± STATOR INSTALLATION ENGINEERING & SUPERVISOR |
|
2008. 10. | KLS | COLPO MARINE EQUIPMENT TRANSPORTATION DESIGN |
|
2008. 9. | DONGBANG | RMQC TRANSPORTATION(GUNSAN-PUSAN) ENGINEERING & SUPERVISOR (S/F FABRICATION, INSTALLATION & REMOVAL) |
|
2008. 8.~ 2009. 1. | POSCO | KWANGYANG NO.2 CAL RCS SHIFTING DESIGN & SUPERVISOR |
|
2008. 5. | DONGBANG | C& HEAVY INDUSTRIES GOLIATH CRANE ERECTION ENGINEERING |
|
2008. 4.~ 2008. 6 | WOOJIN | MARAFIQ HRSG TRANSPORTATION DESIGN |
|
2008. 4. | KHNP | New-KoRi STATOR INSTALLATION ENGINEERING & SUPERVISOR |
|
2008. 3. | DONGBANG | SPREADER BEAM 180TON DESIGN & FABRICATION |
|
2008. 3. | KLS | FLOATING DOCK TRANSPORTATION DESIGN |
|
2008. 2. | DONGBANG | PULLING RIG 2 TRANSPORTATION DESIGN |
|
2008. 2. | HYUNDAI STEEL COMPANY | STRAIGHTENER TRANSPORTATION & INSTALLATION ENGINEERING & SUPERVISOR |
|
2008. 2. | POSCO | POHANG NO.1 BDM HOUSING SHIFTING DESIGN & SUPERVISOR |
|
2008. 1 ~ 2005. 4 | KLS | MARCHWOOD CCGT HRSG TRANSPORTATION DESIGN
MARAFIQ HRSG TRANSPORTATION DESIGN
JEBEL ALI HRSG TRANSPORTATION DESIGN |
|
2008. 1. | HHI | ANALYSIS FOR MARAFIQ IWPP GANTRY TOWER |
|
2007. 12. | KLS | DREDGER TRANSPORTATION DESIGN |
|
2007. 11. | DONGBANG | HSHI GOLIATH CRANE ERECTION ENGINEERING |
|
2007. 11. | LOTTE DAESAN PETROCHEMICAL | VESSEL ERECTION DESIGN |
|
2007. 11. | DONGBANG | PULLING RIG TRANSPORTATION DESIGN |
|
2007. 10. | SHINHAN MACHINERY | WEST EMINENCE2 ACCOMMODATION TRANSPORTATION DESIGN |
|
2007. 10. | SHINHAN MACHINERY | SEADRILL2 ACCOMMODATION TRANSPORTATION DESIGN |
|
2007. 8. | DONGBANG | LIFTING BEAM 2800TON & 1400TON DESIGN & FABRICATION |
|
2007. 7. | DONGBANG | SHI GOLIATH CRANE ERECTION ENGINEERING |
|
2007. 6. | SHINHAN MACHINERY | SEADRILL ACCOMMODATION TRANSPORTATION DESIGN |
|
2007. 6. | DONGBANG | LIFTING BEAM 41M DESIGN & FABRICATION |
|
2007.10. | | |
|
2007. 5.~ 2007. 10. | DONGBANG | SK VESSEL ERECTION DESIGN & SUPERVISOR |
|
2007. 4~ 2007.8 | POSCO E&C | GWANGYANG NO.2 CGL RATIONALIZATION PROJECT
|
|
2007. 3. | DONGBANG | DAEHAN SHIPBUILDING GOLIATH CRANE ERECTION ENGINEERING |
|
2006. 11. | SHINHAN MACHINERY | West E-drill Blocks TRANSPORTATION DESIGN |
|
2006. 11. | SHINHAN MACHINERY | MOHO ACCOMMODATION TRANSPORTATION DESIGN |
|
2006. 10. | SHINHAN MACHINERY | MOHO ACCOMMODATION SUPPORT FRAME ANALYSIS |
|
2006. 10. | DONGBANG | LIFTING BEAM 1000Ton DESIGN & FABRICATION |
|
2006. 09.~ 2006. 10. | SHINHAN MACHINERY | AGBAMI ACCOMMODATION LAODOUT & TRANSPORTATION ENGINEERING |
|
2006. 07. | DONGKOOK STEEL | STRAIGHTENER TRANSPORTATION & INSTALLATION ENGINEERING |
|
2006. 05.~ 2006. 11 | HHI(SEBANG) | ADRIATIC LNG TANK LOCAL TRANSPORTATION DESIGN |
|
2005. 12. | SHI | OVENG/OKUME HULL & TOPSIDE WEIGHING PROJECT |
|
2005. 11. | DONGBANG | TRIANGLE BLOCK FABRICATION |
|
2005. 10. | KLS | STAKING FRAME STRUCTURAL ANALYSIS |
|
2005. 10. | HHI | ADRIATIC LNG TANK TRANSPORTATION DESIGN
- LIFTING PROCEDURE
- WEIGHING PROCEDURE
- LOAD OUT/IN PROCEDURE
- TRANSPORTATION PROCEDURE
|
|
2005. 9. | SGT | LIFTING FRAME STRUCTURAL ANALYSIS |
|
2005. 9. | POSCO E&C | GWANGYANG NO.1 CGL RATIONALIZATION PROJECT |
|
2005. 9. | SHI | ENFIELD WEIGHING PROJECT |
|
2005. 9. | DONGBANG | TRUSS ±¸Á¶Çؼ® ¹× ÀåºñÀÓ´ë |
|
2005. 9. | SHI | OVENG/OKUME WEIGHING |
|
2005. 7. | NDA | SAKHALIN ¥± PROJECT |
|
2005. 7. | DONGBANG | RAIL SUPPORT FRAME DESIGN & FABRICATION |
|
2005. 6. | FOSS | MARINE TIMEBED, BREAKWATER DESIGN |
|
2005. 6. | JOONGBU | UNDERDRAIN JACK UP SYSTEM PROCEDURE |
|
2005. 5. | SHI | DALIA WEIGHING PROJECT |
|
2005. 4. | JOONGBU | PIER SHIFTING PROCEDURE |
|
2004. 8. | SHINHAN MACHINERY | KIZOMBA"B" PROJECT L/Q LOAD-OUT &TRANSPORTATION DESIGN |
|
2004. 8. | POSCO | FURNACE REPLACEMENT PROJECT SLIDING PROCESS DESIGN |
|
2004. 6. | INP | DECKHOUSE LIFTING DESIGN |
|
2004. 4. | HYUPJIN | STACKING FRAME DESIGN & ANALYSIS |
|
2004. 2. | KSCPUSAN | VESSEL LIFTING DESIGN |
|
2004. 1. | SGT | KIZOMBA"B" PROJECT MANIFOLD SKID LOAD-OUT DESIGN |
|
2003.12 | SHI | MAGNOLIA TLP LOAD-OUT OPERAION & SUPERINTENDENT |
|
2003.1 | UOCC | ACCOMMODATION & LQ BRIDGE LOAD-OUT OPERATION & SUPERINTENDENT |
|
2003. 8 | MH MARINE | KINARUT JACKET LOAD-OUT SUPERINTENDENT |
|
2003. 7 | MH MARINE | PANYU 4-2 DRILL RIG LOAD-OUT SUPERINTENDENT |
|
2003. 6 | HHI | PIPE SUPPORT CALCULATION |
|
2003. 5 | UOCC | ACCOMMODATION & LQ BRIDGE LOAD-OUT DESIGN |
|
2003. 4 | MH MARINE | PANYU 5-1 DRILL RIG LOAD-OUT SUPERINTENDENT |
|
2003. 4 | SUNGJIN GEOTEC | FATIGUE ANALYSIS OF VESSELS |
|
2003. 3 | NDA | KIZOMA"A" TOPSIDE MODULE SURVEY |
|
2003. 2 | MH MARINE | PANYU 5-1 DRILL RIG LOAD-OUT SUPERINTENDENT |
|
2002.1 | YOUNGNAM T/P | HEAT-EXCHANGER JACK-UP INSTALLATION |
|
2002.1 | NDA | LIFTING OPERATION FOR 4TSM BLOCKS ON KIZOMBA"A" SURVEY |
|
2002.1 | CHOCTAW | LIFTING BEAM & SHIPPING FRAME DESIGN |
|
2002. 9 | NOOTER-ERIKSEN | LIFTING BEAM & SHIPPING FRAME DESIGN |
|
2002. 8~ 2003. 7 | NDA | BLOCK5 PROJECT SURVEY
(TOPSIDE MODULE & JACKET 32EA) |
|
2002. 8 | NDA | AUDIT & TOWING SURVEY |
|
2002. 6 | HHI | WEST SENO TOPSIDE MODULE TRANSPORTATION?ANALYSIS?&?PRODEDURE |
|
2002. 5 | DESCAB | ENGINEERING & FAB. INSTALLATION OF HP PIPE UNIT MODULE |
|
2002. 5 | NDA | SHI SOUTH PARS PROJECT LOADING SURVEY |
|
2002. 4 | NDA | LAM CON SON GAS PROJECT - SURVEY |
|
2002. 4 | DONG BANG | RMQC TRANSPORTATION ENGINEERING |
|
2002. 2 | JOHN GIBSON | C-TOCK MODULE LOAD-OUT OPERATION |
|
2002. 1 | HHI | BAYU-UNDAN PROJECT PIPING STRUCTURE REINFORCEMENT ENGINEERING |
|
2002. 1 | HANSOL EME | TRANSPORTATION OF GENTRY CRANE |
|
2001. 4 | INP INDUSTRIES | CRANE REINFORCEMENT ENGINEERING |
|
2001. 4 | REPS | ANALYSIS OF PRETENSION OF TENSION BAR |
|
2001. 3 | DOOSAN HIC | ANALYSIS OF THE BOILER STRUCTURE |
|
2001. 2 | HMD | TANIR POWER PLANT SEA-FASTENING ENGINEERING |
|
2001. 1 | DOOSAN HIC | DEAERATOR SUPPORT FRAME DESIGN |
|
2001. 1 | DAISONG | LASHING DESIGN OF GENERAL CARGO |
|
2000.11 | HDEC | KNPC PIPE TRACK INSTALLATION ENGINEERING |
|
2000.11 | SHINHAN MACHINERY | ENGINEERING OF OCEAN TRANSPORTATION OF MHI SHIP-UNLOADER |
|
2000.1 | SHI | SAIBOS F.D.S BOLLARD PULL(150.0 TON)TEST |
|
2000. 9 | DONG BANG | CSU TRANSPORTATION PROJECT |
|
2000. 8 | INP INDUSTRIES | 150TON GANTRY CRANE CONVERTING PROJECT |
|
2000. 8 | HHI | ANALYSIS THE CAUSE OF DAMAGE THE CRANE |
|
2000. 8 | KOPEC | ANALYSIS THE JETTY OF S-OIL |
|
2000. 8 | DOOSAN HIC | UMM AL NA PROJECT TRANSPORTATION STRENGTH ANALYSIS |
|
2000. 4 | HMM | JEP-2 ANALYSIS OF THE CAUSE OF SUNK THE JEP-II |
|
2000. 4 | DONG YANG MACHINERY | TRUNNION STIFFNER STRENGTH REVIEW |
|
2000. 2 | HANJUNG | HADONG CSU TRANSPORTATION DESIGN & SUPERVISION |
|
2000. 2 | ULSAN JUNG-IL CONTAINER TERMINAL | ULSAN JUNG-IL CONTAINER CRANE TRANSPORTATION DESIGN |
|
2000. 1 | KMPRC | WAR-SHIP INSTALLATION ENGINEEERING ON SHORE |
|
|