ÀÏÀÚ | ¹ßÁÖó | °ø»ç³»¿ë |
|
2016. 02.~ | Çѱ¹¼±±Þ | BWMS À°»ó½ÃÇè¼³ºñ Á¦ÀÛ ¹× ¼³Ä¡ |
2016. 01.~ 2016. 02. | Çѱ¹¼±±Þ | BWMS À°»ó½ÃÇè¼³ºñ ¼³°è |
2015. 12.~ 2016. 04. | º¸¼º | HEBRON TEMP. SEAWATER SYSTEM Á¦ÀÛ ¹× ¼³Ä¡ |
2015. 10.~ 2015. 12. | ÁÖ¿ø»ê¾÷ | ¸ðÅÍÄÉÀÌ½Ì Á¦ÀÛ |
2015. 09.~ 2015. 10. | º¸¼º | HEBRON TEMP. SEAWATER SYSTEM ¼³°è |
2015. 07.~ 2015. 08. | °æõ°³¹ß | Çן±â FRAME ¼³°è |
2015. 07. | ¾ËÆå | BARONIA TOPSIDE PACKAGE LIFTING & MOTION Çؼ® |
2015. 06.~ 2015. 07. | ºñ¿£¿¡½ºÄÚ¸®¾Æ | À̵¿Çü¾ÇÃëÁ¦°Å½Ã½ºÅÛ Á¦ÀÛ |
2015. 02.~ 2015. 03. | SK °Ç¼³ | 30TON LIFT FRAME ¼³°è ¹× Á¦ÀÛ |
2015. 01.~ 2015. 02. | Æ÷½ºÄÚÇ÷£ÅØ | ±¤¾ç GTSU 3, 5È£±â ö°Å ¸Å´º¾ó ¹× µµ¸é ÀÛ¼º |
2014. 12.~ 2015. 05. | ¶óÀÎ | ¹®»êÈ£ ¿î¼Û, ¼³Ä¡ ¼³°è ¹× ÇöÀå °¨µ¶ |
2014. 12. | ¼¼¹æ | Å©¶ó¸ð GUYING SYSTEM ÄÁ¼³Æà |
2014. 12. | ¼¼¹æ | 50TON SPREADER ¼³°è ¹× Á¦ÀÛ |
2014. 11. | µ¿¹æ | 175TON SPREADER BEAM ¼³°è ¹× Á¦ÀÛ |
2014. 10.~ 2014. 11. | µ¿¹æ | ¿À»ê¿º´ÇÕ¹ßÀü ÁÖ±â±â ¼³Ä¡ ¿£Áö´Ï¾î¸µ |
2014. 10.~ 2014. 11. | ¾Æ¸Þ½º | ¾ÇÃëÁ¦°Å½Ã½ºÅÛ Á¦ÀÛ |
2014. 10. | ¿ï»ê±³À°Ã» | ¹æ¾îÁøÃÊ, ³²¸ñÃÊ ÀçÇØÃë¾à½Ã¼³ °³¼±°ø»ç |
2014. 09. | ¼¼¹æ | WASTE HEAT BOILER ¿î¼Û¼³°è |
2014. 06.~ 2014. 07. | ¿ï»ê¸éÇã½ÃÇèÀå | ÅëÁ¦½Ç ¾ÆÄÉÀ̵å Á¦ÀÛ ¼³Ä¡ °ø»ç |
2014. 04.~ | ¹é½º¸¶¸° | °¨¾Ðè¹ö 2±â ¼³°è ¹× Á¦ÀÛ |
2014. 04.~ 2014. 05. | µ¿ºÎ | ½ÎÀÌŬ·Ð ÇØü ¹× ¼³Ä¡ ¼³°è |
2013. 12.~ 2014. 02. | Æ÷½ºÄÚÇ÷£ÅØ | ±¸¹Ìº¸ ¼ö¹® º¸¿Ï ¼³Ä¡ °ø»ç |
2013. 12. | ÆǾËÇdzªÄÚ¸®¾Æ | SPREADER BEAM(230Åæ) Á¦ÀÛ ¹× LOADTEST |
2013. 10. | µ¿¹æ | TAILING DEVICE(100Åæ) ¼³°è |
2013. 10. | ÆǾËÇdzªÄÚ¸®¾Æ | SPREADER BEAM(2SETS) & LIFTING YOKE(4SETS) Á¦ÀÛ ¹× LOADTEST |
2013. 9.~ 2013. 10. | ȽÂR&A | ÄÁÅ×ÀÌ³Ê ½ÃÇè¼³ºñ Á¦ÀÛ ¹× ¼³Ä¡ |
2013. 07. | ÆǾËÇdzªÄÚ¸®¾Æ | COMPLETE CRANE SUPPORT Á¦ÀÛ |
2013. 05. | ÆǾËÇdzªÄÚ¸®¾Æ | SPREADER BEAM(130Åæ) Á¦ÀÛ ¹× LOADTEST |
2013. 04.~ 2013. 09. | Æ÷½ºÄÚÇ÷£ÅØ | ±¸¹Ìº¸ ¼ö¹® º¸¿Ï ¼³Ä¡Ç° Á¦ÀÛ °ø»ç |
2013. 04. | ÆǾËÇdzªÄÚ¸®¾Æ | G/T STORAGE KEEPING PACKAGE (3Ç×Â÷) Á¦ÀÛ |
2013. 03. | ÆǾËÇdzªÄÚ¸®¾Æ | G/T STORAGE KEEPING PACKAGE (2Ç×Â÷) Á¦ÀÛ |
2013. 01. | ÆǾËÇdzªÄÚ¸®¾Æ | G/T STORAGE KEEPING PACKAGE (1Ç×Â÷) Á¦ÀÛ |
2012. 12.~ 2013. 01. | µ¿¹æ | ³ëº§¸®½ºÄÚ¸®¾Æ ±³Á¤±â ¼³Ä¡ ¿£Áö´Ï¾î¸µ ¹× ÇöÀå°¨µ¶ |
2012. 7.~ 2012. 11. | ȽÂR&A | BWTS GRE SPOOLL Á¦ÀÛ ¹× ¼³Ä¡ |
2012. 6. | Æ÷½ºÄڰǼ³ | ±¸¹Ìº¸ Àü¸Á´ë º¸° °ø»ç |
2012. 2.~ 2012. 5. | ÇѼÖCSN | ±¤¾çGTSU#9 ¿î¼Û ¼³°è |
2012. 1.~ 2012. 5. | ȽÂR&A | BWTS BALLAST TANK Á¦ÀÛ ¹× ¼³Ä¡ |
2011. 9.~ 2011. 12. | Æ÷½ºÄÚÇ÷£ÅØ | ±¸¹Ìº¸ ¼ö¹® º¸° ¼³Ä¡ |
2011. 9. | ÇѼö¿ø | ¿ïÁø STATOR ¼³Ä¡ ¿£Áö´Ï¾î¸µ ¹× ÇöÀå°¨µ¶ |
2011. 7.~ 2011. 8. | ÇѼö¿ø | °í¸® 3, 4È£±â Åͺó°Ç¹° GALLERY FRAME Á¦ÀÛ ¹× ¼³Ä¡ |
2011. 7.~ 2011. 8. | µ¿¹æ | Ä«¿À½¹ RMQC 3±â ¿î¼Û ¼³°è |
2011. 5. | Çö´ëÁß°ø¾÷ | VESSEL(1700TON) WEIGHING °ø»ç |
2011. 3.~ 2011. 6. | Æ÷½ºÄÚÇ÷£ÅØ | ±¸¹Ìº¸ ÇϺΠSUPPORT Á¦ÀÛ, ¼³Ä¡ ¹× ±Ç¾ç±â ¼³Ä¡ |
2011. 3.~ 2011. 8. | Æ÷½ºÄÚÇ÷£ÅØ | ±¸¹Ìº¸ ¹è»ç¹® Á¦ÀÛ ¹× ¼³Ä¡ |
2011. 2. | ¼ºÁøÁö¿ÀÅØ | RUWAIS ´ã¼ö¼³ºñ INTERMEDIATE SUPPORT ¼³°è |
2011. 1. | ±Ý¼ºÀÌ¿£¾¾ | ¼Ò¼ö·Â °ÅǪÁý ¼³°è ¹× Á¦ÀÛ |
2011. 1. | SLK KUKBO | FSU TOWING & HOOK UP PROCEDURE ÀÛ¼º |
2010. 10. | ÇѼö¿ø | New-WolSong ¥± STATOR ¼³Ä¡ ENGINEERING & SUPERVISOR |
2010. 9. | ÇùÁøÇØ¿î | QURAYYAH STACKING FRAME DESIGN |
2010. 9. | Çö´ëÁß°ø¾÷ | LIFTING BEAM 7.8M Çؼ® ¼³°è |
2010. 8.~ 2010. 12. | Çö´ëÁß°ø¾÷ | ÇÕ»ê Àӽÿ󸮷Π¼³°è, Á¦ÀÛ |
2010. 6.~ 2010. 7. | Æ÷½ºÄڰǼ³ | ±¸¹Ìº¸ ¼ö¹® 2±â Àξç ÀÛ¾÷ |
2010. 2. | SLK KUKBO | FLOAT ON PROCEDURE ÀÛ¼º |
2009. 11. | µ¿¹æ | VESSEL WEIGHING |
2009. 11. | ÇѼö¿ø | New-WolSong STATOR ¼³Ä¡ ENGINEERING & SUPERVISOR |
2009. 10. | COENS | BURNER BOOM SHIPPING SADDLE ¼³°è Á¦ÀÛ |
2009. 9. | ¼¼¹æ | OUTER COOLER SHIPPING FRAME DESIGN |
2009. 9. | SPACO | THRUSTER LIFTING DESIGN |
2008. 12.~ 2009. 7. | µ¿¹æ | VALIDATION MODULE TRANSPORTATION (ULSAN-VANCOUVER,WA) DESIGN |
2009. 7. | COENS | SKARV FPSO EQUIPMENTS 2Ç×Â÷ PACKAGE LOCAL ¿î¼Û°ü·Ã DESIGN |
2009. 5. | COENS | SKARV FPSO EQUIPMENTS 1Ç×Â÷ PACKAGE LOCAL ¿î¼Û°ü·Ã DESIGN |
2009. 4. | ¿ìÁø±Û·Î¹ú | RAS LAFFAN C IWPP HRSG ¿î¼Û°ü·Ã DESIGN |
2009. 3. | ÇѼö¿ø | New-KoRi ¥± STATOR ¼³Ä¡ ENGINEERING & SUPERVISOR |
2008. 10. | KLS | COLPO MARINE EQUIPMENT TRANSPORTATION DESIGN |
2008. 9. | µ¿¹æ | RMQC ¿î¼Û(±º»ê-ºÎ»ê) ENGINEERING & SUPERVISOR (S/F Á¦ÀÛ, ¼³Ä¡ ¹× ö°Å) |
2008. 8.~ 2009. 1. | POSCO | ±¤¾ç NO.2 CAL RCS SHIFTING DESIGN & SUPERVISOR |
2008. 5. | µ¿¹æ | C&Áß°ø¾÷ GOLIATH CRANE ERECTION ENGINEERING |
2008. 4.~ 2008. 6 | ¿ìÁø±Û·Î¹ú | MARAFIQ HRSG ¿î¼Û°ü·Ã DESIGN |
2008. 4. | ÇѼö¿ø | New-KoRi STATOR ¼³Ä¡ ENGINEERING & SUPERVISOR |
2008. 3. | µ¿¹æ | SPREADER BEAM 180TON ¼³°è ¹× Á¦ÀÛ |
2008. 3. | KLS | FLOATING DOCK TRANSPORTATION DESIGN |
2008. 2. | µ¿¹æ | PULLING RIG 2 TRANSPORTATION DESIGN |
2008. 2. | Çö´ëÁ¦Ã¶ | Çü°±³Á¤±â ¼³Ä¡ ENGINEERING & SUPERVISOR |
2008. 2. | POSCO | Æ÷Ç× NO.1 BDM HOUSING SHIFTING DESIGN & SUPERVISOR |
2008. 1 ~ 2005. 4 | KLS | MARCHWOOD CCGT HRSG ¿î¼Û°ü·Ã DESIGN
MARAFIQ HRSG ¿î¼Û°ü·Ã DESIGN
JEBEL ALI HRSG ¿î¼Û°ü·Ã DESIGN |
2008. 1. | Çö´ëÁß°ø¾÷ | MARAFIQ IWPP GANTRY TOWER ±¸Á¶°ËÅä |
2007. 12. | KLS | DREDGER TRANSPORTATION DESIGN |
2007. 11. | µ¿¹æ | HSHI GOLIATH CRANE ERECTION ENGINEERING |
2007. 11. | ·Ôµ¥´ë»êÀ¯È | VESSEL ERECTION DESIGN |
2007. 11. | µ¿¹æ | PULLING RIG TRANSPORTATION DESIGN |
2007. 10. | ½ÅÇѱâ°è | WEST EMINENCE2 ACCOMMODATION TRANSPORTATION DESIGN |
2007. 10. | ½ÅÇѱâ°è | SEADRILL2 ACCOMMODATION TRANSPORTATION DESIGN |
2007. 8. | µ¿¹æ | LIFTING BEAM 2800TON &1400TON ¼³°è ¹× Á¦ÀÛ |
2007. 7. | µ¿¹æ | SHI GOLIATH CRANE ERECTION ENGINEERING |
2007. 6. | ½ÅÇѱâ°è | SEADRILL ACCOMMODATION TRANSPORTATION DESIGN |
2007. 6. | µ¿¹æ | LIFTING BEAM 41M ¼³°è ¹× Á¦ÀÛ |
2007.10. | DONGBANG | SK VESSEL ERECTION DESIGN & SUPERVISOR |
2007. 5.~ 2007. 10. | µ¿¹æ | SK VESSEL ERECTION DESIGN & SUPERVISOR |
2007. 4~ 2007.8 | Æ÷½ºÄڰǼ³(µ¿¹æ) | ±¤¾ç NO.2 CGL ÇÕ¸®È°ø»ç
(FURNACE SHIFTING °ø»ç)
|
2007. 3. | µ¿¹æ | DAEHAN SHIPBUILDING GOLIATH CRANE ERECTION ENGINEERING |
2006. 11. | ½ÅÇѱâ°è | West E-drill Blocks TRANSPORTATION DESIGN |
2006. 11. | ½ÅÇѱâ°è | MOHO ACCOMMODATION TRANSPORTATION DESIGN |
2006. 10. | ½ÅÇѱâ°è | MOHO ACCOMMODATION SUPPORT FRAME ANALYSIS |
2006. 10. | µ¿¹æ | LIFTING BEAM 1000Ton ¼³°è ¹× Á¦ÀÛ |
2006. 09.~ 2006. 10. | ½ÅÇѱâ°è | AGBAMI ACCOMMODATION LAODOUT & TRANSPORTATION ENGINEERING |
2006. 07. | µ¿±¹Á¦° | Çü°±³Á¤±â ±³Ã¼ ¼³Ä¡ ENGINEERING |
2006. 05.~ 2006. 11 | Çö´ëÁß°ø¾÷(¼¼¹æ) | ADRIATIC LNG TANK LOCAL ¿î¼Û¼³°è |
2005. 12. | »ï¼ºÁß°ø¾÷ | OVENG/OKUME HULL & TOPSIDE WEIGHING |
2005. 11. | (ÁÖ)µ¿¹æ | TRIANGLE BLOCK Á¦ÀÛ |
2005. 10. | KLS | STAKING FRAME ±¸Á¶Çؼ® |
2005. 10. | Çö´ëÁß°ø¾÷ | ADRIATIC LNG TANK ¿î¼Û¼³°è
- LIFTING PROCEDURE
- WEIGHING PROCEDURE
- LOAD OUT/IN PROCEDURE
- TRANSPORTATION PROCEDURE
|
2005. 9. | ¼ºÁøÁö¿ÀÅØ | LIFTING FRAME ±¸Á¶Çؼ® |
2005. 9. | Æ÷½ºÄڰǼ³(µ¿¹æ) | ±¤¾ç NO.1 CGL ÇÕ¸®È°ø»ç
(FURNACE SHIFTING °ø»ç) |
2005. 9. | »ï¼ºÁß°ø¾÷ | ENFIELD WEIGHING °ø»ç |
2005. 9. | (ÁÖ)µ¿¹æ | TRUSS ±¸Á¶Çؼ® ¹× ÀåºñÀÓ´ë |
2005. 9. | »ï¼ºÁß°ø¾÷ | OVENG/OKUME WEIGHING |
2005. 7. | NDA | SAKHALIN ¥± PROJECT |
2005. 7. | (ÁÖ)µ¿¹æ | RAIL SUPPORT FRAME ¼³°è ¹× Á¦ÀÛ |
2005. 6. | FOSS | MARINE TIMEBED, BREAKWATER DESIGN |
2005. 6. | Áߺλê¾÷°³¹ß | ¾Ï°Å JACK UP SYSTEM PROCEDURE ÀÛ¼º |
2005. 5. | »ï¼ºÁß°ø¾÷ | DALIA WEIGHING °ø»ç |
2005. 4. | Áߺλê¾÷°³¹ß | PIER SHIFTING PROCEDURE ÀÛ¼º |
2004. 8. | ½ÅÇѱâ°è | KIZOMBA"B" PROJECT L/Q LOAD-OUT &TRANSPORTATION DESIGN |
2004. 8. | Æ÷½ºÄÚ | FURNACE REPLACEMENT PROJECT SLIDING PROCESS DESIGN |
2004. 6. | INPÁß°ø¾÷ | DECKHOUSE LIFTING DESIGN |
2004. 4. | ÇùÁøÇØ¿î | STACKING FRAME DESIGN & ANALYSIS |
2004. 2. | ÄÚ¸®¾ÆÇØ¿î | VESSEL LIFTING DESIGN |
2004. 1. | ¼ºÁøÁö¿ÀÅØ | KIZOMBA"B" PROJECT MANIFOLD SKID LOAD-OUT DESIGN |
2003.12 | »ï¼ºÁß°ø¾÷ | MAGNOLIA TLP LOAD-OUT OPERAION & SUPERINTENDENT |
2003.1 | UOCC | ACCOMMODATION & LQ BRIDGE LOAD-OUTOPERATION & SUPERINTENDENT |
2003. 8 | MH MARINE | KINARUT JACKET LOAD-OUT SUPERINTENDENT |
2003. 7 | MH MARINE | PANYU 4-2 DRILL RIG LOAD-OUT SUPERINTENDENT |
2003. 6 | Çö´ëÁß°ø¾÷ | PIPE SUPPORT CALCULATION |
2003. 5 | UOCC | ACCOMMODATION & LQ BRIDGE LOAD-OUT DESIGN |
2003. 4 | MH MARINE | PANYU 5-1 DRILL RIG LOAD-OUT SUPERINTENDENT |
2003. 4 | ¼ºÁøÁö¿ÀÅØ | FATIGUE ANALYSIS OF VESSELS |
2003. 3 | NDA | KIZOMA"A" TOPSIDE MODULE SURVEY |
2003. 2 | MH MARINE | PANYU 5-1 DRILL RIG LOAD-OUT SUPERINTENDENT |
2002.1 | ¿µ³²È·Â | ¿±³È¯±â JACK-UP ¼³Ä¡°ø»ç |
2002.1 | NDA | LIFTING OPERATION FOR 4TSM BLOCKS ON KIZOMBA"A" SURVEY |
2002.1 | CHOCTAW | LIFTING BEAM & SHIPPING FRAME DESIGN |
2002. 9 | NOOTER-ERIKSEN | LIFTING BEAM & SHIPPING FRAME DESIGN |
2002. 8~ 2003. 7 | NDA | BLOCK5 PROJECT SURVEY
(TOPSIDE MODULE & JACKET 32EA) |
2002. 8 | NDA | AUDIT & TOWING SURVEY |
2002. 6 | Çö´ëÁß°ø¾÷ | WEST SENO TOPSIDE MODULE ¿î¼ÛÇؼ® ¹×PROCEDURE ÀÛ¼º |
2002. 5 | ´ë½ºÄ¸Çǽÿ¥ | HP PIPE UNIT MODULE Á¦ÀÛ¼³Ä¡ |
2002. 5 | NDA | SHI SOUTH PARS PROJECT LOADING SURVEY |
2002. 4 | NDA | LAM CON SON GAS PROJECT - SURVEY |
2002. 4 | µ¿¹æ | RMQC ¿î¼Û¼³°è |
2002. 2 | JOHN GIBSON | C-TOCK MODULE LOAD-OUT OPERATION |
2002. 1 | Çö´ëÁß°ø¾÷ | BAYU-UNDAN PROJECT PIPING STRUCTURE REINFORCEMENT ENGINEERING |
2002. 1 | ÇѼÖÀÌ¿¥ÀÌ | ÇÑ¼Ö CSN °µÆ®¸® Å©·¹ÀÎ À̼³ |
2001. 4 | INPÁß°ø¾÷ | CRANE ÇϺκ¸° °è»ê |
2001. 4 | Æ÷Ç×»ê¾÷°úÇבּ¸¿ø | Áß·®¹° ÇØ»ó¿î¼Û °í¹ÚÀ» À§ÇÑ TENSION BARÀÇ PRETENSION Çؼ® |
2001. 3 | µÎ»êÁß°ø¾÷ | ´ã¼öȼ³ºñ º¸ÀÏ·¯ Áö±× °µµ °ËÅä |
2001. 2 | Çö´ë¹ÌÆ÷Á¶¼± | TANIR POWER PLANT SEA-FASTENING ENGINEERING |
2001. 1 | µÎ»êÁß°ø¾÷ | DEAERATOR SUPPORT FRAME DESIGN |
2001. 1 | ´ë¼Û±â¾÷ | ÇØ»ó¿î¼Ûȹ° LASHING ÀÛ¾÷ |
2000.11 | Çö´ë°Ç¼³ | KNPC PIPE TRACK ¼³Ä¡¼³°è |
2000.11 | ½ÅÇѱâ°è | MHI SHIP-UNLOADER ÇØ»ó¿î¼Û ¿£Áö´Ï¾î¸µ |
2000.1 | »ï¼ºÁß°ø¾÷ | SAIBOS F.D.S BOLLARD PULL(150.0 TON)TEST |
2000. 9 | DONG BANG | Çϵ¿È·Â #5 ¼®ÅºÃë±Þ¼³ºñ C.S.U ¿î¼Û |
2000. 8 | INPÁß°ø¾÷ | 150 TON GANTRY CRANE °³Á¶°ø»ç |
2000. 8 | Çö´ëÁß±â | ¼º¼ö´ë±³ RAMP WAY ¼³Ä¡ °ø»ç ÇöÀå CRANE ¼Õ»ó»ç°í °ËÅä |
2000. 8 | Çѱ¹Çػ簨Á¤ | (ÁÖ)S-OIL ÇÏ¿ª¾Èº® Ãæµ¹ ±¸Á¶ °µµ °ËÅä |
2000. 8 | µÎ»êÁß°ø¾÷ | UMM AL NA PROJECT ¿î¼Û ¾ÈÁ¤¼º °ËÅä |
2000. 4 | Çö´ë»ó¼± | JEP-2 ħ¸ô°ü·Ã »ç°í¿øÀÎ °¨Á¤ |
2000. 4 | µ¿¾ç±â°è | TRUNNION STIFFNER °µµ°ËÅä |
2000. 2 | Çѱ¹Áß°ø¾÷ | Çϵ¿ÇÏ·Â CSU 2±â ¿î¼Û¼³°è ¹× ÇöÀå°¨µ¶ |
2000. 2 | Á¤ÀÏ¿ï»ê | ÄÁÅ×À̳ÊÅ͹̳¯ ¿ï»ê Á¤ÀϺεΠCONTAINER CRANE ¿î¼Û¼³°è |
2000. 1 | Çؾç¿À¿° ¹æÁ¦Á¶ÇÕ | Åð¿ªÇÔ ¿¹ÀÎ/Àξç/°ÅÄ¡ °ü·Ã ¿£Áö´Ï¾î¸µ |